Navi Mumbai Metro Line – Route, Map, Fare & Latest News

Navi Mumbai Metro is expected to serve 1,00,000 passengers by 2027. The Navi Mumbai Metro will interconnect different areas of the city for a better transport system apart from roadways and railway. Also, this highly anticipated infrastructure projects will bring the maximum growth avenues in the Navi Mumbai region. Check this article to know more about the Navi Mumbai Metro line route, map, fare, and the latest news.

Navi Mumbai Metro

Navi Mumbai Metro was planned to provide the city’s residents with a new mode of transportation with excellent connectivity. The metro will interconnect different areas in 4 phases and through extensions, which are as follows:

Lines Route
Line 1 Phase 1 Belapur-Kharghar-Taloja-Pendhar
Line 1 Phase 2 MIDC Taloja-Kalamboli Khandeshwar. It is suggested to extend up to NMIA
Line 1 Phase 3 Interlink between Pendhar and MIDC
Line 1 Phase 4 Khandeshwar to Navi Mumbai International Airport
Line 1A Sagar Sangam to CBD Belapur
Line 2 Extension Pendhar – Navi Mumbai International Airport

The Navi Mumbai Metro network has 33 total planned and active stations, and among them, the operational Phase 1, which comprises 11 metro stations from CBD Belapur to Pendhar. CIDCO took up the construction work of this metro to serve around one lakh passengers by 2027.??

The Metro Project In Navi Mumbai

The Metro Project In Navi Mumbai

The Navi Mumbai Metro project is being developed and overseen by the City and Industrial Development Corporation (CIDCO).??

CIDCO hired the Delhi Metro Rail Corporation (DMRC) to conduct feasibility studies and draft the master plan.

DMRC’s initial master plan for the Navi Mumbai Metro proposed six corridors spanning 120 km. Following a review, the plan was revised to include five metro corridors totaling 106.4 km, with two proposed metro corridors converted into suburban railway corridors.

The construction work for the finalized master plan was started in 2011 for Line 1. This plan was divided into three phases: Phase 1 (Belapur ??? Pendhar), and the other phases were supposed to start by 2015. However, Phase 1 took more than a decade to complete.

Navi Mumbai Metro Map

Navi Mumbai Metro map

Navi Mumbai Metro Line 1 Details

Metro Rail In Navi Mumbai Route

The details of the different phases of the Navi Mumbai Metro Line 1 are provided below:

Phase?? Lines?? Length in km Total stations?? Type??
Phase 1 Belapur-Kharghar-Taloja-Pendhar 11.10 11 Elevated??
Phase 2 MIDC Taloja-Kalamboli Khandeshwar. It is suggested to extend up to NMIA 7.12 8 Elevated??
Phase 3 Interlink between Pendhar and MIDC Taloja 3.87 1 Elevated
Phase 4?? Khandeshwar to Navi Mumbai International Airport 4.17?? 1 Elevated
Total?? 26.2 21

Navi Mumbai Metro Line 1 – Phase 1

The Navi Mumbai Metro project for Line 1 is constructed between Belapur, which is in the north of Navi Mumbai, and Pendhar, a sub-locality situated in the Taloja area of Navi Mumbai. It consists of 11 stations over 11.10 km, which are fully elevated.

Number of stations?? 11
Route length?? 11.10 km
Depot Taloja
Estimated Cost?? Rs. 3063 crore
Stations?? 1. CBD Belapur??

2. RBI Colony

3. Belpada

4. Utsav Chowk (Kharghar)

5. Kendriya Vihar

6. Kharghar Village

7. Central Park??

8. Pethpada

9. Amandoot

10. Pethali – Taloja

11. Pendhar

Read more: All About the First Metro Line of Navi Mumbai

Navi Mumbai Metro Route Map Of Line 1 Phase 1

The route map for Line 1 Phase 1 from CBD Belapur to Pendhar is provided below.

Navi Mumbai Metro map of line 1

Navi Mumbai Metro Line 1 – Phase 2

Line 1 Phase 2 will be from MIDC Taloja to Khandeshwar with a distance of 7.12 km, including eight metro stations. This line will be the extension of Line 1.??

The construction work of Phase 2 and 3 will be carried out by NMMC (Navi Mumbai Municipal Corporation) and MMRDA (Mumbai Metropolitan Region Development Authority).

Estimated Cost?? Rs 2,820 crore
Length?? 7.12 km
Stations?? 8
Type?? Elevated??

Navi Mumbai Metro Line 1 – Phase 3

Phase 3 of Line 1 comprises a short interlink between Pendhar and MIDC Taloja. This section will connect Phase 1 (Belapur – Pendhar) with Phase 2 (MIDC Taloja – Khandeshwar), completing the continuous Belapur – Khandeshwar corridor. The interlink is still pending construction.

Estimated Cost?? Rs 1,750 crore
Length?? 3.87 km
Stations?? 1
Type?? Elevated??

Navi Mumbai Metro Line 1 – Phase 4

This line will be completed between Khandeshwar and Navi Mumbai International Airport (NMIA). This line will be the extension of Line 1.

Estimated Cost?? Rs 1270 crore
Length?? 4.17 km
Type?? Elevated & Underground

Navi Mumbai Metro Fare

The metro fare structure, or ticket prices, is kept nominal so that it is convenient for passengers to travel. The table below shows the updated fare of the Navi Mumbai Metro network.

Distance Travelled Fare
Up to 4 km ???10
4 km to 8 km ???20
Above 8 km ???30

Navi Mumbai Metro Latest News

Maharashtra Government Approves ???5,575 Crore Metro Expansion

In June 2026, the Maharashtra Government approved CIDCO’s ???5,575 crore proposal to expand the Navi Mumbai Metro network.??

The project includes Metro Line 1A (CBD Belapur – Sagar Sangam) and Metro Line 2 (Pendhar – Navi Mumbai International Airport Terminal 4), creating a continuous 28 km metro corridor to improve airport connectivity. Construction is expected to commence in FY 2027- 28.

Read more about: How Will The Navi Mumbai Metro Route Impact The Real Estate Market?

FAQs

1. When did the Navi Mumbai Metro Line 1 Phase 1 operations start?

Ans: The Line 1 Phase 1 operations officially started on November 17, 2023.

2. Which stations are there under Line 1 Phase 1 of the Navi Mumbai Metro?

Ans: There are 11 stations under Line 1 Phase 1, including CBD Belapur, RBI Colony, Belpada, Utsav Chowk (Kharghar), Kendriya Vihar, Kharghar Village, Central Park, Pethpada, Amandoot, Pethali – Taloja, and Pendhar.

3. What is the ticket fare in Navi Mumbai Metro?

Ans: The updated ticket fare is provided below:

Distance Travelled Fare
Up to 4 km ???10
Above 4 km to 8 km ???20
Above 8 km ???30
4. Is there metro connectivity to the Navi Mumbai Airport?

Yes, the Navi Mumbai International Airport will have future metro access through the proposed Mumbai Metro Line 8 (Gold Line) and extensions of the Navi Mumbai Metro.

5. Has the Navi Mumbai Airport metro work started?

Ans: The connecting metro routes to the Navi Mumbai Airport are currently in the pre-construction, planning, and tender-award stages following recent government approvals.