Commuting along the east???west corridor via JVLR has been a frustrating transit cycle for daily travelers in dense suburbs. Especially, Andheri to Vikhroli is one of the most congested areas in Mumbai. Working professionals endure exasperating struggles with road traffic and crowded train hassles.??
That gruesome reality is swiftly shifting with the new Metro Line 6. Commonly known as the Pink Line Metro, Metro Line 6 is reshaping mobility along the JVLR belt. Stretching 15.31 kilometers across Mumbai???s mid-northern suburban axis, this elevated corridor connects Lokhandwala and Andheri West in the west directly to Vikhroli at the Eastern Express Highway.
Pink Line Metro is expected to reduce travel times by 30 to 45 minutes with this dedicated travel alternative. Not only transportation, but Metro Line 6 is set to transform real estate valuation across the central arterial belt of Mumbai.
Page Contents
- Metro Line 6 Project Status & Specifications
- Pink Line Metro Route Map and Station Details
- Metro Line 6 Interchanges & Hyperconnectivity
- Pink Line Metro: An Engineering Marvel With 88% Completion Status
- Real Estate Market Impact Of Metro Line 6
- Top Properties Available For Investing Near Pink Line Metro Route
- Mumbai Metro Line 6: A New Era Of East-West Connectivity
- FAQs
Metro Line 6 Project Status & Specifications

Pink Line Metro is an arterial east???west transit line developed by the Mumbai Metropolitan Region Development Authority. By cutting perpendicularly across north???south corridors of Mumbai, it acts as an essential connective route for commuters.
| Parameter | Project Details |
| Project Name | Metro Line 6/Pink Line |
| Route | Swami Samarth Nagar-Vikhroli Corridor |
| Route Length | 15.31 km |
| Terminal Stations | 13?? |
| Executing Agency | MMRDA |
| Major Intersections | Total 4 |
Pink Line Metro Route Map and Station Details

The Pink Line Metro route is strategically aligned along the JVLR, passing through major commercial centers, IT parks and residential neighborhoods.
The 13 stations along the Pink Line Metro Route include-
| Metro Line 6 Stations | Locality |
| Swami Samarth Nagar | Lokhandwala?? |
| Adarsh Nagar | Oshiwara |
| Jogeshwari West | Jogeshwari |
| JVLR-Metro Line 7 | Jogeshwari-Vikhroli Link Road |
| Shyam Nagar | Jogeshwari East |
| Mahakali Caves | Andheri East |
| SEEPZ Village | SEEPZ MIDC (Andheri East) |
| Saki Vihar Road | Chandivali-Sakinaka |
| Rambaug | Powai |
| Powai Lake | Central Powai |
| IIT Powai | IIT Bombay, Powai |
| Kanjurmarg West | JVLR |
| Vikhroli | EEH |
Metro Line 6 Interchanges & Hyperconnectivity
The strategic strength of Pink Line Metro lies in its multiple interchanges. Commuters can transfer to major rail networks, road routes and other metro lines.
- Metro Line 2A or Yellow Line
Interchange near Adarsh Nagar for smooth travel between Dahisar and DN Nagar. - Metro Line 7 or Red Line
Interchange at JVLR connects Dahisar East to Andheri East near the Western Express Highway.
- Metro Line 3 or Aqua Line
Connectivity near SEEPZ offers underground routes south to BKC and Colaba. - Metro Line 4 or Green Line
Interchange near Gandhi Nagar/Kanjurmarg for transit between Thane and Wadala. - Suburban Railway Network
Direct integration with Western Railway at Jogeshwari Station and Central Railway near Kanjurmarg Station.
Pink Line Metro: An Engineering Marvel With 88% Completion Status
Overall progress on Metro Line 6 has reached near the finish line, which reflects major structural achievement across the main stations.??
Key Breakthroughs
- Western Railway Span Installation- Engineers successfully launched a 42-meter, 169-tonne steel composite span over active Western Railway tracks near Jogeshwari during a 10-hour railway block. This cleared a major structural congestion on the line.
Pending Obstruction and Land Acquisition Milestones
Despite major setbacks, a few key locations gained approval and solutions to initiate further processes.
- Shyam Nagar Station
Lands under no development zone are being acquired through compulsory purchase with necessary compensation. - Kanjurmarg Viaduct Section
Constructing eight remaining piers at the JVLR???EEH junction via advanced possession under the revenue department. - Kanjurmarg Car Depot
The designated 15.02-hectare Kanjurmarg depot site is being evaluated to start early-phase developments. Additional proposals are set to launch passenger operations promptly.
Pink Line Metro Operating Time & Passenger Convenience
Upon commercial launch, the Pink Metro Line timings will follow standard MMRDA operational schedules to match commuter peak periods:
| Parameters?? | Details |
| Operating Hours | 05:30 AM to 11:30 PM |
| Peak Frequency | Every 4-6 minutes?? |
| General Frequency | Every 8-10 minutes |
| Travel Time | 30 minutes (end-to-end) |
Real Estate Market Impact Of Metro Line 6
Transit infrastructure is a primary driver of real estate growth in Mumbai. Metro Line 6 is creating promising property value appreciation along the JVLR corridor, transitioning transit-constrained areas into high-demand residential and commercial hubs.
Andheri West
Existing residential hubs will benefit from the Pink Line Metro route, which offers alternatives to congested road routes. Once completed, the Pink Line Metro is predicted to prompt a steep surge in rental yields and investment appreciation.
Jogeshwari East
This thriving locality connects Andheri East to Powai. The metro line will reduce local congestion, accelerate redevelopment projects and attract homebuyers.
SEEPZ & Saki Vihar Road
The area is the main commercial, IT and industrial precinct of Mumbai. Pink Line Metro will cut commute friction for thousands of office workers and expand commercial lease potential and co-living demand.
Powai
The locality demands a convenient transportation route. Pink Line Metro will solve a persistent rail route inconvenience as it will link Powai to both the Western and Eastern parts.
Kanjurmarg & Vikhroli
Metro Line 6 is positioned as a strategic multi-modal hub due to simultaneous access to the Eastern Express Highway and major interchanges such as Metro Line 4 and Metro Line 2A.
Top Properties Available For Investing Near Pink Line Metro Route

Here is the eminent residential properties list available for investment within Andheri West, Powai, Vikhroli and Jogeshwari East, which is curated by Homebazaar:
| Properties | Property Rates |
| Sheth 72 West | ???2.82 Cr |
| Hiranandani Rockside | ???13 Cr |
| Lodha Reservo | ???3.79 Cr |
| DGS Sheetal Sky | ???2.89 Cr |
| Oberoi Maxima | ???3.5 Cr |
| Veena One Luxe | ???4.5 Cr |
| Grurukrupa Ekam | ???3.09 Cr |
| Hiranandani Empress Hill | ???5.95 Cr |
| Godrej Vistas | ???4.2 Cr |
| Esto Arkis | ???1.71 Cr |
| Adityaraj Bliss | ???81.5 L |
| Vascon Tranquil Heights | ???1.27 Cr |
| Omkar Sereno | ???89 L |
| DLF Westpark | ???6.83 Cr |
| Kalpataru Vivant | ???1.42 Cr |
| Kanakia Silicon Valley | ???2.66 Cr |
| Lodha Evergreen | ???1.68 Cr |
| Adani Linkbay Residences | ???4.99 Cr |
| Lodha Eternis | ???2.2 Cr |
Mumbai Metro Line 6: A New Era Of East-West Connectivity
Metro Line 6 marks a pivotal shift in reforming urban connectivity infrastructure. The metro line does more than just bypass traffic jams; it unlocks smooth intercity movement and reduces daily commute times by up to 45 minutes. It integrates main economic and residential nodes across Andheri, Powai and Vikhroli, offering definite investment appreciation. As final engineering hurdles are cleared and commercial operations launch, Pink Line Metro is set to redefine modern suburban living across northern parts of Mumbai.
FAQs
What area does Metro Line 6 connect to?
Metro Line 6 is a 15.31 km metro route in Mumbai, which connects various localities between Swami Samarth Nagar (Lokhandwala) and Vikhroli.
How many stations are there within the Pink Line Metro route?
The Pink Line Metro route contains 13 stations, including Swami Samarth Nagar, Adarsh Nagar, Jogeshwari West, JVLR, SEEPZ Village, IIT Powai, etc.
How do I find a nearby metro station near JVLR?
Searching for a Metro line near me will route you to the nearby stations near JVLR, which will connect to Mumbai Metro Line 6 as well as interchanges.
What are the Pink Line Metro timings?
The Pink Metro Line timings are scheduled from 05:30 AM to 11:30 PM, with frequencies ranging from 4 to 6 minutes.
Is JVLR Metro Line 6 work completed?
The overall progress of the Metro Line 6 work stands at over 88%. Main milestones such as the Western Railway bridge span at Jogeshwari are complete. While works on the remaining piers near Kanjurmarg, land acquisition at Shyam Nagar and the depot facility continue to move forward.







