The expansion of metro networks in the Mumbai Metropolitan Region has reached a momentous breakthrough with Mumbai Metro Line 9. As an extension of the Line 7 network, Metro Line 9 solves the longstanding connectivity gap between Mumbai’s northern end at Dahisar and the satellite city of Mira-Bhayandar.
For decades, residents of the northern suburbs relied almost exclusively on overcrowded suburban local trains or navigated heavy blockages along the Western Express Highway. The introduction of Metro Line 9 fundamentally transforms commuting, real estate valuation and urban economic mobility across these northern fringes.
Page Contents
- Mumbai Metro Line 9 Specifications And 2026 Update
- Operational Status And Project Phases of Mumbai Metro Line 9
- Mumbai Metro Line 9 Stations And Route Map
- Mumbai Metro Line 9: Dahisar East to Kashigaon Metro Timings
- The Mumbai Metro Line 9 Impact On Northern Suburbs
- Transformation Of Mira-Bhayandar Real Estate
- Reshaping Northern Suburbs With Mumbai Metro Line 9
Mumbai Metro Line 9 Specifications And 2026 Update

Mumbai Metro Line 9 is an 11.38 km corridor executed by the Mumbai Metropolitan Region Development Authority (MMRDA). The route runs on the upper part of the double-decker bridge without any external interference. Serving as the northern extension of Metro Line 7, which connects Andheri East to Dahisar East, Line 9 is extended deeper into the Mira-Bhayandar Municipal Corporation (MBMC) limits.
Technical Details of the Mumbai Metro Lines 9 Project:
| Parameters?? | Features |
| Project Name | Metro Line 9/Red Line Extension |
| Executing Agency | MMRDA |
| Route Length?? | 13.58 km |
| Project Budget | 6,607 Cr |
| Track Gauge | 1435 mm |
| Speed | 80 km\h |
| Projected Daily Capacity | 8.47 Lakh |
Operational Status And Project Phases of Mumbai Metro Line 9
MMRDA structured the project launch into two phases to avoid unnecessary traffic congestion:
- Phase 1 (Dahisar East to Kashigaon)
Opened for public operations on April 7, 2026. This 5-km initial stretch includes 4 operational stations such as Dahisar East, Pandurang Wadi, Miragaon and Kashigaon.
- Phase 2 (Kashigaon to Subhash Chandra Bose Stadium)
Under active execution with heavy civil, systems integration and station fit-out work. Full operation across all remaining stations is targeted for late December 2026.
Mumbai Metro Line 9 Stations And Route Map

The Mumbai Metro Line 9 route map runs along the Western Express Highway before venturing into the puzzled commercial and residential routes of Mira Road and Bhayandar. MMRDA constructed 7 major Foot Over Bridges (FOBs) along the corridor to directly link key road intersections and public hubs to station concourses.
List Of the serviceable and under construction Metro Line 9 Stations:
| Metro Line 9 Stations | Availability Status |
| Dahisar East | Operational |
| Pandurang Wadi | Operational |
| Miragaon | Operational |
| Kashigaon | Operational |
| Sai Baba Nagar | Dec 2026 Onwards |
| Medtiya Nagar | Dec 2026 Onwards |
| Shahid Bhagat Singh Garden | Dec 2026 Onwards |
| Subhash Chandra Bose Stadium | Dec 2026 Onwards |
Crucial Interconnections: Metro Line 7 And Line 9 Interchange
The Dahisar East to Kashigaon metro section functions as an uninterrupted continuation of Metro Line 7. Commuters boarding at Kashigaon or Miragaon can travel straight through Dahisar East down to Gundavali in Andheri without changing trains, turning a fragmented journey into a single hassle-free ride.
Through the main interchange hub at Dahisar East, commuters unlock two major paths to Andheri-
- To Andheri East- Direct connection via Line 7 to WEH, Hubtown Solaris and Gundavali.
- To Andheri West- Interchange at Dahisar East with Line 2A to reach Link Road, Malad, Goregaon West and D.N. Nagar.
Future Cross-Suburban Extensions
- Airport Connectivity
Direct reach to Chhatrapati Shivaji Maharaj International Airport via the upcoming underground Metro Line 7A extension. - Thane Alignment
Future interchange at Miragaon station with Metro Line 10 (Gaimukh to Miragaon) to connect the Western Suburbs to Thane city. - Northern Extension
Planned integration with Metro Line 13 extending towards Vasai-Virar.
Mumbai Metro Line 9: Dahisar East to Kashigaon Metro Timings

The operational Phase 1 stretch provides punctual service designed to match peak daily commute requirements.
| Criterion | Specifications?? |
| First Train?? | 6:30 AM |
| Last Train | 11:00 PM |
| Peak Hour Frequency | Every 5-7 minutes?? |
| General Hour Frequency | Up to 10 minutes |
| Price Rate | ???20 Rupees |
The Mumbai Metro Line 9 Impact On Northern Suburbs
Travel Time Reduction??
Road congestion on the Western Express Highway, especially at the Dahisar Toll Naka, frequently resulted in 90-minute bumper-to-bumper commutes from Mira Road to Andheri.
The Metro Line 9 reduces the commute time for the varied corridors such as Mira Road to Andheri East and Mira Road to Bandra.
Environmental Effect And Traffic Decongestion
Metro Line 9 offers an estimated reduction of over 1.5 lakh vehicular trips daily along the Dahisar-Mira Bhayandar stretch. It provides an alternative route for extreme overcrowding on the Western Railway suburban line between Bhayandar, Mira Road and Borivali stations during peak hours. Metro Line 9 manages to reduce fuel consumption and vehicular emissions along the outer WEH belt.
Transformation Of Mira-Bhayandar Real Estate

Investment Value Appreciation
Residential property prices in Mira Road, Kashigaon and Beverly Park have improved by 14% over the past three years. Neighbourhoods within 1 km of metro stations are witnessing the highest growth.
Rental Yields Returns
Rental demand from working professionals employed in commercial hubs such as Malad Mindspace, NESCO IT Park and Andheri MIDC has pushed rental yields in Mira Road up to 4%.
Shift to Grade-A Developers
Established national real estate developers such as Lodha Group, Kalpataru Group, JP Infra and Rustomjee Group have launched large gated communities to move the market from budget housing to mid-luxury residential developments.
Commercial Real Estate Boom
Lower office rents in Mira-Bhayandar compared to BKC or Andheri are encouraging retail chains, co-working operators and corporate back offices to establish spaces along the Metro 9 corridor.
Top Properties Available For Investing In Mira-Bhayandar

Here is the eminent residential properties list available for investment, which is curated by Homebazaar–
| Properties | Property Rates |
| JP North Garden City | ???57.44 L |
| Kanakia Beverly Heights | ???83 L |
| Kalpataru Shrishti Namaah | ???1.35 Cr |
| Lodha Casa Supremo | ???93 L |
| Sunteck Sky Park | ???1.23 Cr |
| JP The Palace | ???75 L |
| Sanghvi S3 Skyrise | ???75 L |
| Vihang Avaana | ???1.25 Cr |
| Mayfair Palmeira | ???1.09 Cr |
| Prestige Garden Trails | ???91 L |
| N Rose Northern Hills | ???1.74 Cr |
| Kolte Patil Vaayu | ???1.16 Cr |
| Aaradhya High Park | ???94.82 L |
Reshaping Northern Suburbs With Mumbai Metro Line 9
The opening of Mumbai Metro Line 9 marks a major shift in how the northern suburbs connect to the rest of the city. The Dahisar extension has delivered fast travel alternatives to existing congested road and train routes. Metro line 9 has quickly reduced travel time for working professionals in Mira-Bhayandar. With Phase 2 nearing completion, real estate properties and enterprises see steep growth in investment values. As surrounding transit links such as the Versov???Virar Sea Link take shape, Metro Line 9 secures its spot as a commute lifeline for future growth of North Mumbai.
FAQs
Is Mumbai Metro Line 9 working?
Yes. Metro Line 9 is partially operational. Phase 1, which runs from Dahisar East to Kashigaon opened on April 7, 2026. Phase 2 is scheduled to open by December 2026.
How will Metro Line 9 benefit occupants of Mira Road?
Metro Line 9 provides direct travel options for the Mira-Bhayandar locals. It offers hassle-free commutes compared to the heavy highway traffic and reduces travel time to Andheri to under 40 minutes. The metro route offers commutes across Mumbai and boosts property values.
Which station is the main interchange on Metro Line 9?
Dahisar East is the primary interchange station, which connects Line 9 with Line 7 and Line 2A. Miragaon is planned as a future interchange for Line 10.
What is the total cost of the Mumbai Metro Line 9 project?
The Line 9 corridor is 11.38 km long with 8 stations. The total project budget for Metro Line 9 is nearly ???6,607 Crores.
Can I travel directly from Mira Road to Mumbai Airport via Metro?
Once Metro Line 7A is completed, passengers can travel from Mira Road stations via Line 9 connected to Line 7 and Line 7A, which connects to Mumbai Airport without leaving the metro network.







